2011/11/29

New milestone reached: 200mA in the storage ring

Yesterday, 28 of November, about 19h local time, the storage ring of Alba have reached a new record in the accumulated beam: 200mA. (machine is design to work at 400 mA)


Photo of one of the screens in the Alba's place with the machine status


The head of the accelerators division have send an email to all the stuff in Alba, thanking all of us and saying that this is not only a success of Accelerators Division, it's a success of all the Alba's team and we like to share this milestone with all of us.


Photo taken the 26 of Nov, from the EC-JQK


This kind of small details contribute to the behaviour of the Alba's workers. Small things that made easy the live, and encourages to do more. It's the base of the workers the ones who are doing this. Even the dangers that one can find in the corridors.


Also I like to mention that yesterday I have reach one of my goals having a cycling of all the magnets of the storage ring with out any of them failing. I still have some problems with the setpoint on this power converters, but they are reduced from the 15% (when I have take the project) to the current 0'1% error rate. But I still like to reduce this to 0%. The device must be the last responsible to apply a setpoint. If the user tells the device, it has to insist until exhaust and it's not easy to leave a process exhaust.


Trend with all the storage ring magnets cycled

No comments: